EV charge points

EV chargers that look tidy and just work.

No trunking maze, no cables across the pavement. Just a properly installed charger, with load checks and a quick walkthrough of the app before we leave.

  • Smart scheduling for cheap-rate charging
  • Load management + main fuse checks
  • Tethered or untethered options
  • Neat cable routes & tidy finish

We can also pair chargers with solar and battery systems (e.g., GivEnergy / Growatt) where it suits your routine.

Before we quote

  • • Photos of your consumer unit & meter
  • • Where you park and where you’d like the charger
  • • Whether you already have solar or plan to

That’s usually enough for a fixed quote. If anything’s unclear, we’ll pop out and have a proper look.

Paperwork

Electrical certification provided. DNO notification handled where required.

No-nonsense installs

We talk you through cable routes and how it’ll look before we drill anything.

Integration with solar

If you already have solar/battery, we’ll look at how charging fits around that.

Support after install

We don’t vanish. If you’ve got questions later, you can actually reach us.

What affects the price

Most EV installs are straightforward, but a few things can change the scope. If you send photos we’ll price it properly up front.

Cable route & distance

How far the charger is from the consumer unit and the best route to keep it tidy.

Main fuse & load

We check capacity and apply load management where needed (no guesswork).

Earthing arrangement

TN-C-S / TT considerations, correct protection, and any required upgrades.

Wall/surface type

Brick/render/pebble dash/tiles + internal access affect time and finish.

External works

Trenching/ducting or outbuilding supplies can add scope (we’ll be clear).

Charger choice

Tethered vs untethered, smart features, and solar-linked charging options.

How we do it

Step 1

Details & photos

A couple photos + where you park is usually enough to quote.

Step 2

Fixed quote

Clear pricing and what we’re doing — no vague “maybes”.

Step 3

Tidy install

Neat cable routing, proper testing, and a clean finish.

Step 4

Sign-off

Certificate issued + quick app walkthrough before we leave.

Gallery

The current image has no alternative text. The file name is: qtq80-jqRIpv.jpeg

Book an EV charger survey

Tell us about your parking, main fuse and where you’d like the charger. If you can attach photos of the consumer unit and driveway, we can firm up a quote quickly.

Fastest way to reach us

Send an Enquiry

Click below to open the enquiry form and upload photos. We’ll pick it up and come back to you quickly.

Open Enquiry Form
Photo Uploads Neat installs